← All modules
COMMERCIAL MODULELIVE

Machining Cost Estimator

Your estimator's judgement, written down and used on every job.

Kojo captures how your senior estimator thinks — cycle times per operation, machine hour rates, setup allowances — and applies it the same way every time. New staff get the answer he would give.

Ø120OP10 Turning8.2 minOP20 Drilling4.6 minOP30 Deburr1.7 minCycle time14.5 min

WHAT IT DOES

Six things Machining Cost Estimator handles for you.

01

Operation-wise time

Turning, milling, drilling, grinding: each operation timed by your own rules.

02

Machine hour rates

Every machine carries its own rate, capabilities and setup time.

03

Setup spread by quantity

Setup and tooling are spread across the batch, so small orders aren't underpriced.

04

Material weight and scrap

Stock size and allowance give the real material cost, not the finished weight.

05

Rules you control

Your estimator signs off every rule. Overrides are allowed and logged.

06

Straight into the quote

The finished estimate drops into the Quote Engine with one click.

HOW IT WORKS

Four steps, every time.

1

Pick material and stock size

2

Add operations in order

3

Kojo calculates time and cost per operation

4

Adjust if needed, then push to the quote

BEFORE AND AFTER

What changes on day one.

Machining shops quoting from drawings: turning, milling, drilling and grinding work.

TODAYWITH KOJO
Cycle times guessed from memory→Per-operation rules
Only one person can estimate→Anyone can, the same way
Setup forgotten on small batches→Setup spread automatically
Margin leaks go unnoticed→Every cost line visible

AVAILABILITY

Included in every plan.

Live now. Ready to set up at your factory.

StarterGrowthEnterprise

QUESTIONS

About Machining Cost Estimator.

How do you capture our estimator's knowledge?

We sit with him during setup and turn his rules of thumb into rates and formulas he approves.

What if a job is unusual?

He can override any line. Kojo keeps a record of the override.

Does it handle many machines?

Yes. Each machine has its own hour rate and capabilities.

WORKS WELL WITH

Pair it with these modules.

QUOTE · Q-2611Raw material₹184.20Machining₹96.40Setup₹12.00Overhead₹28.10Margin 18%₹57.73₹378.43per piecePDF →Sent 9:12 AM
COMMERCIALLIVE

Quote Engine

Professional quotes out the door in minutes, not days.

Explore module →
Flange assy₹378.43 / pcEN8 bar₹184.20Machining₹96.40Fasteners₹14.60Ø125 stock2.1 kgScrap0.4 kgVariance +6% on EN8vs standard this batch
OPERATIONSROLLING OUT

RM Consumption & BOM Costing

The true cost of every part, at today's material price.

Explore module →
MONTUEWEDTHUFRIM-01M-02M-03M-04M-05Clash on M-03 · Wed
OPERATIONSROLLING OUT

Production Scheduler

Every order on a machine. Every clash spotted before it happens.

Explore module →

Let's quote your
next job together.

Book a free 30-minute visit. We'll run one of your real jobs through Kojo on the spot. Outside India? We'll do it on a video call.

Book a factory visit