FOR PUMP AND VALVE MAKERS

Software for pump and valve makers: castings in, tested units out

A pump or valve order touches bought-in castings, machining, bought-out parts, assembly, a pressure or performance test and a stack of documents. Kojo prices each unit from your own rates, keeps the bill of materials at today's prices and follows the order through to dispatch and payment.

HOW THE WORK IS PRICED

What really sets the price in pumps and valves.

Castings set the base cost. Bodies, bonnets, casings, impellers and discs come in grey or ductile iron, cast carbon steel such as WCB, stainless such as CF8 and CF8M, or bronze, bought per kg from foundries or poured in-house, so their price moves with metal prices. Then come the bought-out parts: motors for pump sets, mechanical seals, bearings, gaskets, actuators and fasteners. Material of construction changes the price sharply. A valve with stainless or hard-faced trim, or a pump with a stainless impeller and shaft, costs far more than the same size in standard materials.

Conversion covers machining of bodies and casings, flange facing and drilling, impeller balancing, seat lapping, assembly and painting. Testing is a real cost: valves go through shell and seat tests to standards such as API 598, and pumps run on a test bed for head, flow and power, often to ISO 9906. Project buyers add documentation, material test certificates traced to heat numbers, and customer or third-party inspection, and often hold back part of the payment until documents or commissioning. Distributors and the replacement market, by contrast, buy catalogue models from a price list less a discount, so that list has to keep pace with real cost.

THE HEADACHES

Where the time and margin go.

Castings you don't control

Most bodies and casings come from outside foundries at a rate per kg that moves with metal prices. A casting that leaks at the hydro test also wastes the machining already done on it.

Hundreds of variants

One valve in several sizes, pressure classes, end connections and trims, or one pump in several materials and motor ratings, multiplies into hundreds of models. Costing each by hand is slow, and the price list falls behind.

Offers that go quiet

Project enquiries need datasheets, revisions and clarifications, and can stay open for weeks. With dozens of offers out, follow-up depends on someone remembering.

Cash held back after dispatch

Part of the payment often waits for documents, inspection or commissioning. Small balances on old orders add up, and nobody chases them.

THE WORKFLOW

From enquiry to payment.

  1. 01

    Enquiry or tender

    A distributor orders from the price list, or a project buyer sends datasheets with size, pressure class, material of construction, duty point, end connections and test and inspection needs.

  2. 02

    Selection and costing

    Select the model and materials, then cost castings, bought-out parts, machining, assembly, testing, painting and documents, and add margin.

  3. 03

    Order and procurement

    Release casting orders to foundries against your patterns, and buy motors, seals, bearings and trim parts.

  4. 04

    Machining and assembly

    Machine bodies, bonnets, casings and impellers, balance impellers, lap seats and assemble.

  5. 05

    Testing and inspection

    Hydro test valves for shell and seat, run pumps on the test bed, hold customer or third-party inspection where required and prepare test certificates.

  6. 06

    Dispatch, documents and payment

    Dispatch with documents and invoice, then follow each payment through to the final balance.

WHERE KOJO FITS

Kojo for pumps and valves.

COMMERCIAL

LIVE

Quote Engine

Pick the customer and model, and Kojo builds the quote: castings and bar from the raw-material price master, machining from your rates, and assembly, testing and documentation from your own rates and costing rules, set up during onboarding. The PDF quote is ready in minutes.

Explore module →

OPERATIONS

ROLLING OUT

RM Consumption & BOM Costing

Define each model's bill of materials once: castings, trim, seals, bearings, motor and fasteners. Kojo shows the true cost at today's material prices, so you can see when the price list has fallen behind.

Explore module →

COMMERCIAL

LIVE

Machining Cost Estimator

Captures your senior estimator's cycle times for boring, facing, drilling and turning of bodies, casings, shafts and impellers, with machine hour rates and setup allowances, and applies them the same way on every quote.

Explore module →

COMMERCIAL

ROLLING OUT

Quote Follow-ups

Every offer sent gets an automatic follow-up schedule by email and WhatsApp, so project enquiries don't go cold while they wait for a decision.

Explore module →

OPERATIONS

ROLLING OUT

Inventory & Reorder

Tracks castings, seals, bearings, gaskets and other consumables against real usage, and warns at the reorder point, rounded up to the supplier's minimum order quantity.

Explore module →

COMMERCIAL

ROLLING OUT

Payments & Collections

Reminds customers before and after each due date on WhatsApp, email and SMS, and shows who owes what and for how long, including small balances on older orders.

Explore module →

STARTER TO ENTERPRISE

The same system as you grow.

Start with quoting, add production, inventory and payments, then scale across plants with integrations and a dedicated support team.

STARTER

Start with quoting. Casting prices, machining rates, bought-out costs and margins go into Kojo, so catalogue models and project offers are priced the same way, and every offer is followed up.

GROWTH

Add BOM costing and inventory to keep model costs at today's prices and bought-out stock in check, then shop-floor logging and payment reminders as the order book grows.

ENTERPRISE

For makers with a foundry and a separate machining or assembly plant, or several sites, Enterprise adds multi-plant roll-up reporting, an open API and integrations for accounting and ERP systems, a dedicated support team and an uptime SLA.

NUMBERS TO WATCH

What to track every week.

FIRST-PASS TEST RATE

Units that fail the hydro or performance test come back for rework after all the cost is in.

MATERIAL COST AGAINST STANDARD

Castings and bought-out parts are most of the cost, so drift here goes straight to margin.

OFFER-TO-ORDER CONVERSION

Shows whether offers are priced right and followed up, especially on project enquiries.

OVERDUE RECEIVABLES BY AGE

Balances held back for documents or commissioning are easy to forget and slow to collect.

COMMON MATERIALS

Materials you will quote in.

Each material page has properties, equivalent grades and a free weight and machining cost calculator.

QUESTIONS

Pumps and Valves on Kojo.

Can we see the true cost of each pump or valve model at today's prices?

Yes. With BOM costing you define each model's bill of materials once, and Kojo works out the true part cost at today's material prices from the raw-material price master. It also shows consumption variance against standard.

Our project offers stay open for weeks. How does follow-up work?

Every quote sent from Kojo gets an automatic follow-up schedule by email and WhatsApp. Offers are chased on time instead of relying on someone's memory.

How do we get started?

Start with a free 30-minute visit (in India) or a remote demo. Kiviro then configures your machines, rates, margins and quote templates, brings in your Excel data and trains the team, and quoting goes live in about three weeks.

Let's quote your
next job together.

Book a free 30-minute visit. We'll run one of your real jobs through Kojo on the spot. Outside India? We'll do it on a video call.

Book a factory visit